Thursday, November 01, 2007

WEEK 6 - WALLS GOING UP !! -

Column forms standing at the street entrance - 5 truckloads of fill dirt to be shoveled by hand into the foundation

19 20 22

Main level starting to take shape - standing on the Cabina terrazzo 

This will be the Master Bedroom above the lower level garage.  The opening is for french doors opening onto the terrace which will be 10 ft wide extending along the entire  wall.

21