SingingTree
A New Life In a New Home Town
Sunday, November 18, 2007
Thursday, November 01, 2007
WEEK 6 - WALLS GOING UP !! -
Column forms standing at the street entrance - 5 truckloads of fill dirt to be shoveled by hand into the foundation
Main level starting to take shape - standing on the Cabina terrazzo
This will be the Master Bedroom above the lower level garage. The opening is for french doors opening onto the terrace which will be 10 ft wide extending along the entire wall.